Other News

University College London Hospital, London

The capitals landmark hospital, University College London Hospital, located at the top of Tottenham Court Road has again selected CABLEFLOW systems for phase 2 of the development currently under construction by BCJV.

Having selected the impressive performance characteristics of the integra system for the main Phase 1 tower block, distinctive for its 16 floors and clean white facade which can be seen across London’s sky line, architects LDW and contractor BCJV have again selected CABLEFLOW bedhead system for the Phase 2 maternity works on the EGA wing.

Using CABLEFLOW’s specialist equipment for maternity and LDRP rooms, the entire site will now feature state of the art bedhead services product from the UK’s leading manufacturer.

“This second phase order is testament to the quality of product, flexibility and workmanship we demonstrated on a very difficult and intricate phase 1 element to this project. We are delighted to have been awarded the contract and are grateful for the prestige of working on such a flagship NHS hospital brings to our business and what it says about the systems we produce” commented Communications Director John Cunningham.